씨앤포이엔지(주)

Product제품

  • Home
  • 제품
  • Mechenical Equipment
  • Auto-Docking Engine Trolley

Mechenical Equipment

Auto-Docking Engine Trolley

Quicker Engine Installation in the Test Cell
Existing engine mounting system : max. 1 day
New trolley docking system : min. 30 min
Pre-Setup Engine Utility Line
Pre-setup of fuel, coolant outside the test cell
Minimizing waste time in the test cell
Reuse of installed engine with trolley
Reuse of installed engine for more engine test later
Pre-Setup for Engine-Dyno. Co-axis Alignment
Pre-setup of co-axial alignment on the master bed system
Flexible Cell Operation Through Alignment Between Test Cells
Test in another cell of the installed engine tested in the other cell